The Smith Innovation Hub is approximately 302 acres (1/2 square mile) with mostly light industrial and office uses. It is bounded by Rio Salado Parkway, Loop 101, University Drive and McClintock Drive. It was selected for the pilot area because of its unique innovation ecosystem near current and planned transit investments, adjacency to the ASU Novus Innovation Corridor and other amenities and variety of uses already in place.

SmithRoadImprovementsDesignGuidelinesInfastructurePlanEmailSignUpContact

Smith Road Improvements

University Drive to Rio Salado Parkway

Construction anticipated early January through Spring 2024.

Improvements include:

  • asphalt pavement removal
  • new curbs and gutters
  • bike lanes
  • traffic calming measures to include medians
  • landscaping and irrigation
  • improving sidewalk ramps to meet Americans with Disabilities (ADA) standards
  • stormwater improvements

Construction begins south end at University Drive and progresses north to Rio Salado Parkway. During construction, traffic will be maintained in both directions, but a middle turn lane will be unavailable. Access to businesses remain open but may be inaccessible for short periods of time.

Questions: Bob Sanders, Project Manager:  602-316-3800

Public Meetings
Background
Background
Public Meetings
Background
Strategies
Updates

contactsx200
Josh Rutherford
Economic Development Program Manager
(480) 350-8813
joshua_rutherford@tempe.gov

Background

The Innovation Hub Initiative was approved by Tempe City Council on March 1, 2018. It is an economic development initiative to enhance key employment corridors to promote new investment, job creation and placemaking that attracts and retains a quality workforce. Eight hubs were identified and the Smith Innovation Hub was selected for the pilot project.

Purpose

The purpose of the City's efforts is to:

  • Guide public and private infrastructure improvements
  • Identify and prioritize infrastructure needs for short- and long-term timeframes
  • Provide planning-level costs and prepare an implementation plan 

Implementation 

Projects will be phased in over time, as funding becomes available, using this plan as a guide for many years to come. City staff will also continue to work with private developers to provide opportunities to implement infrastructure or fund improvements.

Documents

ULI AzTAP Summary Report

Apache Character Area Plan

Innovate Tempe Presentation

Smith Industrial Stakeholders June 28, 2018 Meeting Presentation

Smith Industrial Stakeholders June 28, 2018 Meeting Summary

Smith Industrial Innovation Hub General Plan Amendment

Smith Industrial Innovation Hub Development Guidelines

Tempe General Plan 2040

Tempe Transportation Master Plan